Time frame: 05.11.2024-15.11.2024
Man power: 4 installers
Type of millwork: Restaurant Commercial
Challanges: Tight installation deadlines with 20 hours shift, Metal Pieces installation in tiles holes with cement.
Millwork Installation project was completed for the famous Burger King and took place in North Vancouver. The tables had unusual way of installation. The holes in the tiles were drilled and filled with cement, to fixate the metal legs of the tables and seats. Also installed a metal partition wall at the entrance same way, using a cement for the posts. The project had to be completed in tight deadline, and we did a 20 hour shift to prepare the job site for inspection in 3 days.