Time frame 1: 29.07.2025-09.10.2025
Time frame 2: 26.02.2026-11.05.2026
Location: 777 Pacific Blvd, Vancouver, BC V6B 4Y8
Man power: 2-8 installers
Type of millwork: Commercial, High End
Challenges: Connection and seams of the wood panelling required additional attention. We have installed 2500 sqft of Ceiling panels, Column bulkhead
Copyright © 2025 Karbonit - All Rights Reserved.
construction@karbonit.ca