Time frame: 29.07.2025-09.10.2025
Man power: 2-8 installers
Type of millwork: Commercial, High End
Challanges: Ceiling panels installed on the unique fasteners, heavy wood panelling on the bulkheads. Coordination with Electrical trade
Connection and seams of the wood panelling required additional attention. We have installed 2500 sqft of Ceiling panels, Column bulkheads,